Planning Guide · Kitchen Timeline

How long a kitchen remodel takes

A kitchen with white cabinets
  • CSLB #1111311

    Insured & Bonded

    Fresno & Clovis

    Mon–Sat 7 AM–5 PM

Planning Guide · Kitchen Timeline

How long a kitchen remodel takes

A kitchen with white cabinets
  • CSLB #1111311

    Insured & Bonded

    Fresno & Clovis

    Mon–Sat 7 AM–5 PM

Planning Guide · Kitchen Timeline

How long a kitchen remodel takes

A kitchen with white cabinets
  • CSLB #1111311

    Insured & Bonded

    Fresno & Clovis

    Mon–Sat 7 AM–5 PM

Guide

A kitchen remodel moves through planning, ordering, demolition, rough work, cabinets, countertops, and finish work. What happens before demolition sets the pace for all of it.

You’re ready to stop cooking around a drawer that won’t close and a single working burner, but you also need to know how long the house will be upside down. The honest answer is that the schedule depends more on decisions made before demolition than on anything that happens after it. Here’s how the phases fit together, and what stretches or shortens each one.

The phases at a glance

  1. Planning and selections

  2. Ordering long-lead items

  3. Permits, when the work requires them

  4. Demolition

  5. Rough plumbing and electrical, with inspections when required

  6. Drywall, flooring, and cabinet installation

  7. Countertop templating, fabrication, and installation

  8. Backsplash, fixtures, appliances, and trim

  9. Final walkthrough

Some phases overlap, and some can’t start until the one before has been inspected or measured. Most kitchens also have a few stretches where the work waits on materials, which is normal, and good planning keeps them short. See our remodeling process for the steps that come before construction.

Before demolition: the part that sets the pace

Planning and selections come first: the layout, cabinet design, countertop material, sink and faucet, lighting, flooring, backsplash tile, hardware, and paint. Choose appliances early, because cabinet openings, electrical and gas connections, and countertop cutouts all depend on the exact models.

Then comes ordering. Cabinets are usually the longest wait, especially semi-custom and custom lines that are built to order, and the kitchen cabinet cost guide explains how those lines differ. Special-order sinks, tile, light fixtures, and appliances can take time too. A kitchen torn out while its cabinets are still being built just sits empty, so it makes sense to schedule demolition around delivery.

Here’s a simple test before the first day. If someone asked you tomorrow which grout color, which cabinet pulls, or which pendant goes over the island, could you answer? If not, that decision is still open, and open decisions are where schedules slip.

Permit needs are confirmed during the in-home consultation. If your project needs one, plan review and the inspections that follow become part of the schedule; see remodel permits by city and county for local details.

Demolition and rough work

Demolition starts with protecting floors and closing off the kitchen to contain dust. Then the old cabinets, counters, and, if they’re being replaced, the floors come out. This is when hidden conditions show up, such as water damage under the sink, old wiring, or a floor that slopes, and decisions about them happen here, before anything new goes in.

Rough work follows. Plumbing and electrical changes are made by licensed trades we coordinate, new boxes are set for lights and outlets, and when a permit is involved, inspections happen before the walls are closed. A kitchen that keeps its layout has far less rough work than one that moves the sink or range, which is one of the clearest ways layout decisions show up in the schedule.

Drywall repairs come next, along with patching where old soffits or fixtures came out. Walls are often primed or painted before the cabinets go in, since it’s easier to paint an empty wall than to cut in around new boxes.

Cabinets, counters, and the waiting gap

Flooring timing depends on the material. Tile is often installed before the cabinets, while some floating floors are meant to go in after them, since they shouldn’t be pinned under heavy boxes; compare the two in LVP vs tile flooring.

Cabinets go in next, set level and plumb even where the floor and walls aren’t. Once they’re secured, the countertop fabricator templates the tops from the installed cabinets, fabricates them, and comes back to install. That gap is often the hardest stretch for a household, since there’s usually no working sink.

After the counters are in, the sink, faucet, cooktop, and dishwasher get connected. If you’re keeping your cabinets and only replacing counters, the sequence is shorter, but the templating gap still applies.

Finish work and the final walkthrough

With counters in place, the backsplash tile goes up and gets grouted. Light fixtures, under-cabinet lights, and hardware are installed, appliances are set and tested, and paint gets touched up. A final inspection happens here when the permit calls for one.

Appliance delivery is worth coordinating early. A range or refrigerator that arrives before the kitchen is ready needs somewhere to wait, and one that arrives late holds up the final connections.

The final walkthrough is your chance to open every drawer, run every faucet, test the lights, and point out anything that isn’t right. Small adjustments, like a door that needs aligning, are normal at this stage.

What stretches a kitchen schedule, and what keeps it moving

Things that add time

  • Layout changes that mean more rough work and inspections

  • Custom cabinets and special-order items

  • Changing a selection after it has been ordered

  • Damage found during demolition

  • Waiting on decisions in the middle of the job

  • Items that arrive damaged and have to be reordered

Things that help

  • Every selection made before demolition, including appliances and hardware

  • Keeping the existing layout where it already works

  • Choosing in-stock items when timing matters more than options

  • Quick answers when questions come up

  • A clear path for crews and deliveries to reach the kitchen

Living in the house while it happens

Most homeowners stay home during a kitchen remodel. Set up a temporary kitchen in another room with the refrigerator, a microwave, a coffee maker, and a slow cooker or electric skillet, and plan simple meals. Paper plates and a laundry sink or bathtub for washing up make it easier.

Expect noise during working hours, a protected path through the house, and dust kept inside the work area as much as possible. Keep pets and kids clear of the work zone, and see living through a kitchen remodel for more practical advice. If the work falls in the hot months, set the temporary kitchen up in a cool room and lean on meals that don’t need the oven.

Want a number before you think about dates? The kitchen estimator turns your selections into a planning range in a few minutes. The schedule itself comes later, during planning, once the in-home consultation is done and your selections and lead times are known.

Plan your project

See your planning range

Answer a few questions and see a personalized range in minutes. It’s a planning number, not a quote.

Questions

Straight answers.

What usually takes the longest in a kitchen remodel?

Why is there a gap between cabinet installation and countertops?

When should I pick my appliances?

Can any part of my kitchen stay usable during the remodel?

Get started

Start with a better understanding of what your renovation could cost.

Choose your project to get started.

Your online range is for planning purposes only. It is not a guaranteed quote or final project price.