Planning Guide · Hiring a Contractor

How to compare remodeling bids

Couple reacts to good news in kitchen
  • CSLB #1111311

    Insured & Bonded

    Fresno & Clovis

    Mon–Sat 7 AM–5 PM

Planning Guide · Hiring a Contractor

How to compare remodeling bids

Couple reacts to good news in kitchen
  • CSLB #1111311

    Insured & Bonded

    Fresno & Clovis

    Mon–Sat 7 AM–5 PM

Planning Guide · Hiring a Contractor

How to compare remodeling bids

Couple reacts to good news in kitchen
  • CSLB #1111311

    Insured & Bonded

    Fresno & Clovis

    Mon–Sat 7 AM–5 PM

Guide

Three bids that look nothing alike are hard to judge. Here is how to line up scope, allowances, exclusions, and contract terms so you are comparing the same job.

You asked three contractors to look at the same kitchen, and you got back three documents that barely resemble each other. One is a single page with a total, one runs several pages of allowances, and one leaves out half of what you talked about. Before you compare totals, make sure you are comparing the same job.

Start with one written scope that everyone prices

The Contractors State License Board (CSLB), which licenses contractors in California, recommends getting at least three written bids and making sure they are based on the same plans, specifications, and scope of work. The simplest way to do that is to write your own scope before anyone visits. It doesn’t need to be technical, just specific. A useful scope sheet covers each part of the room:

  • Layout: same footprint, minor changes, or moving fixtures

  • Cabinets or vanity: keep, reface, or replace, and how much storage you want

  • Counters, backsplash, tile, and flooring, with the materials you are leaning toward

  • Shower, tub, sink, faucet, and toilet choices

  • Lighting, outlets, and ventilation you want added or replaced

  • Paint, trim, doors, and drywall repair

Hand the same sheet to every bidder. When a contractor suggests something different, ask them to price it as an option instead of folding it into the base number. That keeps the base bids comparable and still lets you see good ideas.

Read the line items, not just the total

A low total often means something is missing. CSLB tells homeowners to be wary of any bid that is substantially lower than the others, because it may contain a mistake or leave out work the other contractors included. Go through each bid with a highlighter and mark every item from your scope sheet. Pay special attention to work that is easy to leave out of a price:

  • Demolition, haul-away, and disposal

  • Floor and dust protection for the rest of the house

  • Drywall patching and paint after plumbing or electrical work

  • Trim, baseboard, and transitions where new flooring meets old

  • Final cleanup

If one bid lists these and another doesn’t mention them, ask the second contractor whether they are included. Get the answer in writing, since a verbal yes is easy to forget once the work starts.

Line up allowances and exclusions

An allowance is a placeholder amount for something you haven’t picked yet, such as tile, light fixtures, or a faucet. Allowances are normal, but they can make a bid look lower than the finished job will be. If one bid carries a modest tile allowance and another prices the tile you actually showed them, the gap between totals doesn’t tell you much.

Ask each contractor what their allowance would buy and whether it covers material only or material and installation. Then read the exclusions. Common ones include repairs to damage hidden in walls or floors, electrical panel work, and anything the bidder considers outside their license. An exclusion isn’t a red flag by itself, but you should understand it before you sign.

Check the license, insurance, and who does the work

California requires contractors to put their license number on bids, contracts, business cards, and advertising. Before you compare anything else, look up each number and confirm the license is active and the classification fits the job. Our guide to checking a contractor’s license in California walks through the lookup step by step.

Ask who will actually be on site and who you call with questions. If someone other than the license holder sells you the job, CSLB requires that salesperson to be registered as a Home Improvement Salesperson. CSLB also notes that a contractor with employees must carry workers’ compensation insurance, and that the contract must tell you about both workers’ compensation and commercial general liability coverage.

Some work needs specific licenses or engineering no matter who holds the main contract. New circuits, re-piping, moving gas lines, and structural changes fall in that group, so ask each bidder how that part of the job is handled and by whom. With All American, those items are evaluated during the in-home consultation.

Compare payment terms and the paperwork

How a contractor wants to be paid tells you a lot. California caps the down payment on a home improvement contract at a small amount, and CSLB’s consumer pages spell out the exact limit. After that, payments should follow a written schedule and should never get ahead of the work that has been done. CSLB’s guidance says a complete contract includes:

  • A detailed description of the work and products, down to size, color, and model number where it matters

  • A start date and a completion date

  • Written direction on who obtains any needed permits

  • Written change orders, signed before a change is made

  • Notices about your right to cancel and about mechanics liens

Where a right to cancel applies, homeowners age 65 and older get a longer window than the usual three days. If anything you were promised in conversation is missing from the contract, ask for it to be added before you sign.

Ask how surprises and changes are handled

Every remodel has unknowns until the old finishes come off. Older homes are more likely to hide water damage, outdated wiring, or corroded pipes, and our guide to remodeling older Fresno homes covers what to watch for. A good bid explains what happens when the crew finds something unexpected: who documents it, how it is priced, and how you approve it.

You want changes written, priced, and signed before the work happens, not settled at the final invoice. Ask each bidder to describe that process in plain terms. The answer says a lot about how the rest of the project will go.

How our process fits into a bid comparison

All American starts differently from a typical bid visit. You answer questions in the online estimator and see a personalized planning range first, so you know whether the project fits before anyone comes out. Our article on how our estimate works explains why that number is a range and not a quote.

If the project fits, the free in-home consultation is where measurements, existing conditions, permits, and selections are confirmed. You then get a clear plan and schedule that you can hold up against any other bid, line by line. Our remodeling process page lays out each step, and our guide to what changes the price of a remodel explains why two honest bids can still differ.

Plan your project

See your planning range

Answer a few questions and see a personalized range in minutes. It’s a planning number, not a quote.

Questions

Straight answers.

Should I just pick the lowest remodeling bid?

How many bids should I get for a kitchen or bathroom remodel?

What is an allowance in a remodeling bid?

Is the All American online range the same as a bid?

Get started

Start with a better understanding of what your renovation could cost.

Choose your project to get started.

Your online range is for planning purposes only. It is not a guaranteed quote or final project price.